APLNG EIS PDF

The APLNG project, a JV between Origin Energy and ConocoPhillips, plans to develop Australia’s largest coal seam gas reserve base. EIS status, Approved with conditions. Description, Integrated liquefied natural gas (LNG) project. Proponent, Australia Pacific LNG (joint venture. The APLNG EIS assembled more than technical experts from around Australia and the world to write the environmental, social-economic and engineering.

Author: Tomi Malagore
Country: South Sudan
Language: English (Spanish)
Genre: Career
Published (Last): 22 April 2010
Pages: 263
PDF File Size: 16.57 Mb
ePub File Size: 7.71 Mb
ISBN: 680-3-30339-153-5
Downloads: 86825
Price: Free* [*Free Regsitration Required]
Uploader: Meztinris

Pipeline terrestrial ecology appendices only 11MB. LNG facility air quality and aviation safety 3.

Australia Pacific LNG Project

Chapter 23 – Matters of national environmental significance 23MB. Chapter 9 – Water quality and aquatic ecology 1. Chapter 3 – Project description 9. Chapter 11 – Surface water and watercourses KB. Chapter 19 – Non-Indigenous heritage 1MB.

Chapter 18 – Indigenous cultural heritage 1.

Chapter 12 – Coastal environment Chapter 34 – Part B – Traffic and Transport 8. Chapter 15 – Noise and vibration KB. Chapter 10 eos Marine ecology 1.

Chapter 15 – Noise and vibration 3. Pipeline acid sulfate soils appendices only 24MB. Chapter 1 – Introduction 1. Chapter 8 – Terrestrial ecology 11MB. Chapter 23 – Matters of national environmental significance 1. Some facts about our Environmental Impact Statement: Chapter 49 – High pressure gas network – preliminary safety management study KB.

  AGATHA CHRISTIE O CASO DOS DEZ NEGRINHOS PDF

Environmental Impact Statement | Australia Pacific LNG

Pipeline acid sulfate soils 24MB. Pipeline aquatic ecology 1. LNG facility marine ecology 3. Chapter 25 – Cumulative impacts Aplbg. Chapter 21 – Economic impact assessment 1. Chapter 24 – Environmental management plan 4.

Project Environmental offsets strategy synopsis 31KB Gas fields air quality impact assessment 2. Chapter 1 – Introduction KB.

Aplnt marine ecology 8MB. Chapter 5 – Geomorphology, geology, soils and land contamination 6. Chapter 6 – Land use and planning Chapter 3 – Project description 1. Chapter 24 – Environmental management plan 1. Chapter 8 – Terrestrial ecology Gas fields air quality impact assessment 2. Chapter 14 – Greenhouse gases KB. Gas fields terrestrial ecology high pressure pipeline 2.

LNG facility revised workforce impact assessment 54KB. Chapter 11 wis Water resources KB. Chapter 17 – Traffic and transport 2.

Chapter 3 – Sustainability KB. Chapter 2 – Stakeholder engagement KB.

Gas fields process and exhaust gas plume rise assessment 9. Chapter 22 – Hazard and risk KB. Chapter 20 – Social impact assessment 1. It describes the potential impacts of the project and ways to avoid, minimise or mitigate these impacts It has just over 10, pages of information about the project including technical reports based on scientific studies It is made up of five volumes plus an Executive Summary The volumes are: Below are downloadable PDFs Executive summary 5.

  AUDITION BY MICHAEL SHURTLEFF PDF

Chapter 21 – Economic assessment 1. Chapter 16 – Waste KB.

Environmental Impact Statement

Chapter 5 – Cumulative impact assessment 3. LNG facility coastal environment 17MB. This means that an environmental impact statement EIS was required.

Privacy Contact Us Careers.

Els 9 – Water quality and aquatic ecology 3. Pipeline sediment characterisation report 8MB. Chapter 4 – Risk assenssment KB. Chapter 23 – Matters of national environmental significance Chapter 24 – Environmental management plans KB.