AIA FORM G704 PDF

Do whatever you want with a Aia G fill, sign, print and send online instantly. Securely download your document with other editable templates, any time, with. The Work performed under this Contract has been reviewed and found, to the Construction Manager’s and Architect’s best knowledge, information and belief. THIS TEMPLATE HAS BEEN REPLACED WITH THE UPDATED VERSION AND WILL RETIRE ON MAY 31, IF YOU CONTINUE TO PURCHASE.

Author: Gogal Kigar
Country: Timor Leste
Language: English (Spanish)
Genre: Spiritual
Published (Last): 17 November 2017
Pages: 112
PDF File Size: 11.67 Mb
ePub File Size: 12.84 Mb
ISBN: 429-3-68587-474-6
Downloads: 45397
Price: Free* [*Free Regsitration Required]
Uploader: Galkree

After October forrm,a user will no longer be able to create a contract document from the version or edit a version. To avoid confusion and ambiguity, do not use this construction management document with any other AIA construction management document.

This scope requires the architect to identify and analyze the threats to a facility, survey the facility with respect to those threats, and prepare a risk assessment report.

A not for establishes the duties of the owner, architect and contractor, but also sets forth in g04 how they will work together through rorm phase of the project: The document is intended to clarify the assumptions, roles, responsibilities, and obligations of the parties; to provide a clear, narrative description of services; and to facilitate, strengthen, and maintain the working and contractual relationship between the parties.

This document may be used with a variety of compensation methods. Thus, AIA Document A— is provided to assist A— users either in modifying it, or developing a separate supplementary conditions document to attach to it. AIA Document C— is suitable for use with all types of consultants, including consulting architects and ala be used with a variety of compensation methods. This agreement may be aa with a variety of compensation methods, including percentage of construction cost and stipulated sum.

AIA Document B— was developed with the assistance of several federal agencies and contains terms and conditions that are unique to federally funded or federally insured projects.

The specific services the consultant is required to perform are set forth within the document as well as the Integrated Scope of Services Matrix, which is part of the C— Target Cost Amendment.

The form asks the requesting party to list the relevant drawing, specification or submittal reviewed in attempting to find the information.

The compensation model in the non-owner member agreements is goal-oriented and provides incentives for collaboration in design and construction of the project, and for the quick and effective resolution of problems as they arise. Neither the request nor the response received provides authorization for work that increases the cost or time of the project.

Basic services are based on five phases: These documents are not set to expire until May 31, Part A relates to contracts, Part B relates to insurance and bonds, and Part C deals with bidding procedures. AIA Document B— contains a compressed form of basic services with three phases: A— contains its own terms and conditions. Further, if parties attempt to finalize an expired document after October 31,AIA will not allow the parties to finalize that document; instead, the parties will either have to use the version of those documents or find alternate means of finalizing their contract.

  LACTANCIA MATERNA Y FORMULAS LACTEAS PDF

Thus, AIA Document D— is provided to assist users either in modifying those documents, or developing separate supplementary conditions documents to attach to them. To obtain project funding, the company enters into a separate agreement with the owner. GDB—, Acknowledgement of Substantial Completion of a Design-Build Project Because of the nature of design-build contracting, the project owner assumes many of the construction contract administration duties performed by the architect in a traditional project.

The compensation model is also goal-oriented, and provides incentives for collaboration in design and construction of the ais. It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete description of the change.

A was renumbered in and was modified, as applicable, to coordinate with AIA Document A— The parties may be all architects, all engineers, a combination of architects and engineers, or another combination of professionals.

B— contains terms and conditions that are unique to these types of projects. The forms require the contractor to show the status of the contract sum to date, including the total dollar amount corm the work completed and stored to date, the amount of retainage if anythe total of previous payments, aix summary of change orders, and the amount of current payment requested.

AIA Document G— was developed as a directive for changes in the work which, if not expeditiously implemented, might delay the project.

This scope requires the architect to perform the traditional contract administration services while design services are provided by another architect. Ai are divided traditionally into basic and additional services. A—, as a standard form document, cannot cover all the particulars of a project.

No Rights to the AIA Documents after October | BuildSmart

Basic services are performed in five phases: AIA Document C— defines digital data as information, communications, drawings, or designs created or stored for a specific project in digital form. Services are divided along the traditional ofrm of basic and additional services.

AIA Document B— uses the traditional division of services into Basic and Additional Services but adds a new Pre-Design Services article that includes items such as assessment of project feasibility, layout, and regulatory requirements. This document anticipates torm the developer-builder will have extensive control over the management of the project, acting in a capacity similar to that of a developer or speculative builder of a housing project, and that the developer-builder is an entity that has experience aiw applicable residential building codes, selection of materials and systems, and methods of installation and construction.

  KLIPSCH RW-10D MANUAL PDF

Document Titles and Prices

Once an AIA document expires, the user will no longer have the ability to create a new document from the expired version, edit the expired version, or even finalize an expired version. Though written primarily to support a project using integrated project delivery IPDE may also be used on projects delivered by more traditional methods. The programming services also include information gathering to develop performance and design criteria, and developing a final program of project requirements.

The major difference between AIA Documents GCMa— and G— is that the signature of the construction manager adviser, along with those of the owner, architect and contractor, is required to validate the change order. A requires that the parties utilize building information modeling.

No Rights to the AIA 2007 Documents after October 2018

AIA Document G— breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. Additionally, C allows for the non-owner members to receive profit through incentive compensation and goal achievement compensation.

AIA Document C— provides the terms under which the non-owner members provide services to the SPE to complete the design and construction of the project. This scope provides a menu of choices of services, including initial existing condition surveys of the building and its systems, evaluation of operating costs, and code compliance reviews. AIA Document C— provides the framework for a collaborative environment in which the parties operate in furtherance of cost and performance goals that the parties jointly establish.

Though not a flrm to the contract for construction between owner and contractor, the architect participates in the preparation of the contract documents and performs construction phase duties and responsibilities described in detail in the general conditions.

B was renumbered only for same content as BINT—, exp ired C— is coordinated with C— in order to implement the principles of integrated project delivery, including the accomplishment of mutually-agreed goals.

The non-owner parties are compensated on a cost-of-the-work basis. Because subcontractors are often required to provide professional services on a design-build project, A provides for that possibility. B— replaces B— expired B— assumes that the owner will retain third parties to provide cost estimates and project schedules, and may implement fast-track, phased or accelerated scheduling.