22TCN 247-98 PDF

For Prestressed Rural Girder, design standards: 22TCN Rural product Technical specifications and acceptance”, 22 TCN 22 TCN 05 “Specification for bridge design” TCN – 98 “Work execution and acceptance regulations” TCN “Steel. TCVN Earth works – Construction and Acceptance 22TCN Bars for Pre-stressing Concrete 22TCN Construction and Inspection of.

Author: Akinocage Akinotaxe
Country: Togo
Language: English (Spanish)
Genre: Art
Published (Last): 27 June 2011
Pages: 447
PDF File Size: 10.86 Mb
ePub File Size: 6.83 Mb
ISBN: 482-6-20241-784-5
Downloads: 4072
Price: Free* [*Free Regsitration Required]
Uploader: Dogis

Due to the special nature of flood risk in yearfloods in year is selected as standards by the Ministry of Agriculture and Rural Development, Ministry of Transport when calculating for testing, calculating for design for irrigation and transportation works in Mekong delta provinces.

Deck slab is reinforced concrete 30MPa 10cm thick and 5cm of reinforce concrete 30MPa for cover.

According to the Terms of Reference and other documents: Bridge with one lane. The selected span layout is to meet and satisfy the following requirements: Calculation sheets – Volume 4: Ensuring security and defense of the frontier region of Mekong Delta provinces and will be the basis for research for development and replicate the model of multi-modal transport. Monthly average temperature, highest and lowest temperature is presented in the 22tcnn table: Khi to d ng lc: Design of Concrete Structures – Concrete Using the driven pile is suitable.

  7041916 SPEC 5006 PDF

Ph gia C chng ch k thut, c cc c quan qun l Nh nc cng nhn: Incase of two cars run in 2 ways on the bridge because they can not see each other.

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm I18m tiếng anh

We have a comparison for two options: The upgrading of roads, waterways in the region will bring enormous benefits, contribute to poverty alleviation, socio-economic development and create conditions for inter-connection in the regions, reducing rate of traffic accidents on roads and waterways. Bridge area is affected by tidal regimes of sea and internal rain. Nguyn tc chung 3.

In terms of flood peak, flood duration, total volume and risk level, the flood of year was the biggest flood during recent 75 years.

Project Management Unit of Waterways. ASTM A or equivalent. So we need 2 lanes for span next to the middle span. The next is clay, clay with sand stiff state to medium stiff, and last is fine-size sand with clay, dense state.

BLLT J2 Vol 2 specification rev14 EN CONTRACT | Duc Nguyen Ngoc –

Existing bridge has spans arranged: If we buy it, 22tcj must transport km from factory to the site. TCVN or equivalent. When designing this route, should ensure conformity with general development plan and not obstruct the flow. Survey results show that traces of floods history in year were not faded. Results of hydrology calculation are shown in detail in separate reports, here only a summary of water level data used in design works as follows: Kt cu b tng v b tng ct thp ton khi Thp c t b tng cn nng Hot rolled steel for From comparison of 2 options, Consultant chooses the option of Bailey for middle span because it is cheaper.

  AMPHETAMIN SYNTHESE ANLEITUNG PDF

Thp thanh trn trn. Due to above characteristics, land is frequently swamped and.

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm – Tài liệu text

According to the Decision No. The biggest monthly absolute humidity is about Construction of prestressed concrete structures Engineering.

Monthly average absolute humidity is presented in the table below.